PG-ZAAP-C GENERATION
The goal of this project is to supply 48 MW of power to meet the electricity demand of the electric centrifugal pumps that PEMEX is installing to maximize crude oil production at the Ku Maloob Zaap Field. The generation platform will be connected to the existing PB-ZAAP-C Production Complex by a bridge and a network of underwater cables; peripheral platforms will be powered with 34.5 KW.
Scope of Work: Our scope included detailed engineering, procurement, fabrication, loading, marine assurance, transportation, installation, and commissioning of the PG-ZAAP-C power generation platform.