BorWin5
Dragados Offshore, in consortium with Siemens, is carrying out the engineering work (including conceptual, basic, and design engineering), procurement of equipment and materials, construction, loading, transportation, installation, testing, and commissioning of the BorWin5 HVDC (High Voltage Direct Current) Platform and its associated jacket.
The project consists of an electrical power transmission system with a capacity of 900 megawatts, located near the He Dreiht offshore wind farm, off the island of Borkum, on the German North Sea coast. The project includes a heliport and a residential module with all the necessary basic services for the rest and comfort of the maintenance technical staff, who supervise the proper functioning of the platform once a year.
Scope of Work: Design, supply, construction, transportation, and installation of the platform and the structure (jacket), while Siemens’ scope includes the design and supply of the HVDC equipment for both substations and the development of the onshore station. Together, the installation will be commissioned, tested, and put into operation.