SOUTH ARNE

The South Arne Phase 3 Project involved the expansion of the South Arne offshore field in Denmark with two additional wellhead platforms, one to the north (WHPN) and one to the east (WHPE), along with an interconnecting bridge. The WHPN has 12 wellheads, is isolated, and includes a helicopter platform. The WHPE has 6 wellheads and is connected to an existing platform by a bridge.

Scope of Work: Our scope included engineering, procurement, and construction (EPC) of two wellhead platforms with weights of 1,600 t and 1,350 t respectively, as well as the two jackets supporting these platforms, each weighing 2,600 t. The detailed engineering for the EPC contract was subcontracted to the KBR office in London, under our direct supervision.

Gallery